REAL-TARGET PROOF · SALESFORCE DEVELOPER EDITION

Salesforce had already done it.
TrustGate could not know that yet.

TrustGate Consequence Control Proof
Salesforce Real-Target Reference

Salesforce committed a real Account action, but its success response did not reach TrustGate. TrustGate kept the consequence UNKNOWN and refused protected continuation until fresh Salesforce readback established what had happened.

Salesforce reality

A real Account existed.

The consequence existed outside TrustGate.

TrustGate knowledge

UNKNOWN

The execution result had not reached TrustGate.

The bounded sequence

  1. Real action
  2. Salesforce commit
  3. Success response lost
  4. UNKNOWN
  5. Retry / conflict refused
  6. Fresh Salesforce readback
  7. CONFIRMED

What the test established

The real external commit occurred. UNKNOWN survived restart and external process death. Equivalent and conflicting protected continuation was refused before a second protected Salesforce write.

Then we tried to break it

The bounded matrix recorded PASS for: response timeout after commit; temporarily unavailable target readback; request never reaching Salesforce; process killed after Salesforce committed; outside-custody second consequence (PASS / CONFLICT); and forged target attribution (PASS / CONFLICT). These outcomes do not all mean CONFIRMED.

Bounded failure matrix

  • Response timeout after commitPASS
  • Target readback temporarily unavailablePASS
  • Request never reached SalesforcePASS
  • Process killed after Salesforce committedPASS
  • Outside-custody second consequencePASS / CONFLICT
  • Forged target attributionPASS / CONFLICT

PASS means the expected safe behavior passed. PASS / CONFLICT means CONFLICT was the intended safe outcome; it does not mean the action was confirmed.

Why Salesforce itself was not saving us

In separate qualification, Salesforce accepted two ordinary Account POSTs carrying the same canonical business action identity. The absence of a second protected POST in the ambiguous proof therefore came from the TrustGate fence, not Salesforce deduplication.

What this proves

In the Salesforce Developer Edition test, a real target action completed even though its success response was lost. TrustGate kept the protected operation unresolved, refused another protected write, and established the outcome only after fresh Salesforce evidence. The test demonstrates this behavior for the specifically assessed action path.

Scope of this Salesforce demonstration

This is a real-target reference in Salesforce Developer Edition, not a customer production deployment. It demonstrates the specific action, uncertainty and evidence-resolution behavior described above. Production operation requires target-specific integration, path coverage, operational controls and customer acceptance. Other execution routes and unrelated targets are not covered by this test.

Proof video

Watch the Salesforce reference: a completed external action, a missing success response, a blocked repeat action and resolution using fresh target evidence. Real Salesforce Developer Edition test · specific protected action path.

Captions are available as English WebVTT and Portuguese WebVTT.

A buyer question

If your target may already have committed an action but the acknowledgement disappears, what prevents another route from acting before external truth is established?

Where this evidence applies

The observed results apply to the tested Salesforce Developer Edition action and the specified protected route. A customer deployment is evaluated against its own target, authority and credential boundaries, execution paths, evidence sources and operational requirements. Read the detailed assurance limits in Claims and Boundaries.

Return to the TrustGate Sovereign homepage